Restroom Renovation at the School

The boys and girls restroom in the basement of the original school building is in need of repair.

  • Reconfiguration of the plumbing
  • Reinforcement of exterior walls
  • Removing old steam pipes
  • Improved design and layout

Photos of items needing repair: